MINECOST SUBSCRIBER REPORT FOR SEPTEMBER
==========================================
Updated Models
---------------------
The following iron ore models have been updated and are now on the
minecost website.
Alegria
Brockman
Brucutu
Capanema
Carajas
Carol Lake (IOC)
Caue
Channar
Los Colorados (Algorrobo)
Conceicao
El Romeral
Empire
EVTAC
Fabrica
Fazendao
Feijao
Goldsworthy
Hibbing Taconite
Keewatin (National Steel)
Kiruna
Kudremukh
LTV Hoyt
Malmberg
Marandoo
Minntac
Minporca
Mt Newman
Mt Wright (QCM)
Northshore
Paraburdoo
Pico
Robe River
Savage River
Sishen
Tilden
Timbopeba
Mt Tom Price
Wabush
West Angelas
Yandi
Yandicoogina
If you have downloaded any of these models in the past three months,
you are entitled to download the revised model at no additional charge.
Cost Curves
----------------
The Iron Ore cost curves have been updated to incorporate these model revisions.
The curves are for 1998 to 2004 and contain cost rankings for each iron ore saleable product in US cents/mtu and for tons of ROM ore.
Model Productivity Factors
----------------------------------
The iron ore models now contain adjustment factors in the Edit sheet that allow users
to change mine and mill labour productivity and consumables usage rates, independently
of the flowsheet and other settings built into the models.
This makes the models even more flexible since users can now "tune" the models to
match known actual performance or test various scenarios and look at sensitivities.
These adjustment factors are now incorporated into all minecost models.
See previous reports and updates.
Return to minecost news
Go to World Mine Cost Data Exchange home page